Update by Christine Taylor
Good afternoon,
As you can see the traffic lights on Castle Terrace are back in place, to enable the excavation and installation of the pipework for the gravity sewer crossing. The team are also pouring concrete to the valve chamber base, which is located at the bottom of the site, in the farmers field.
Next week, Directional Drilling will be on site to start work on the rising main section.
Have a lovely weekend.
Christine