The construction phase of this project is now complete.

There may still be updates, so the project will remain here. We are still monitoring the project and will reply to any comments. So if you have any questions please feel free to comment or contact us here.

GENERAL PROJECT
CURRENT WEATHER
3°C

Guisborough Road, Nunthorpe

We are upgrading the sewer network. This will increase the resilience and reliability of the network and will involve installing 240 meters of surface water sewer pipe in the area of Guisborough Road, Beverley Road and York Road. We will work closely with the local authority regarding the reinstatement of roads when the works are completed.

Project updates

Update by Sarah Jayne Parvin

,Good afternoon All,

We have had to enact a road closure at the junction of Byland Road and York Road, as there is insufficient space to allow cars to safely pass as we carry out our work.

This will be followed by a similar closure on York Road, meaning homes before the junction will need to leave and access their properties via Byland Road. Please see traffic management routes.

Due to the work on York Road, some driveways will be inaccessible for a small period. We will correspond with these properties in question prior to carrying out the work and will give as much advanced warning as possible.

As ever we appreciate your understanding, and we will endeavour to keep the disruption to a minimum. Please don’t hesitate to contact us using the ‘contact us’ button at the top of this page.

Thank

Sarah

MMB

Update by Sarah Jayne Parvin

Kids Fun Day - Saturday 25th August 11.30-1.30

Avenue Play Park, Nunthorpe

I'll be along there hoping to get a look at the Birds of Prey! If you see me come say hi, also happy to answer any questions you may have.

Mott Macdonald Bentley have donated prizes for the Tombola tomorrow, pictures below of what’s up for grabs!

It would be great to see you, and remember all the funds raise go back into the community.  Fingers crossed the weather stays dry.

PS Guisborough Road is now back in action.

 

Happy bank holiday weekend!

Sarah 

 

Update by Sarah Jayne Parvin

Good evening All, some good news!

Great progress has been made along Guisborough Road, allowing the removal of the road closure on the 24th August, 5 days earlier than originally communicated.

This has now enabled us to proceed sooner than expected with the work along York Road. We will be introducing a single lane road closure, on the 28th August, starting from the junction with Byland Terrace moving towards Beverly Road.

As always any questions please dont hesitate to use the contact us button at the top of the page.

Enjoy the bank holiday weekend!

Regards 

Sarahjayne 

Update by Sarah Jayne Parvin

Good morning Residents, we would like to provide you a quick update with regards to the work on Guisborough Road. Things are moving along nicely and we are nearing the end of the 6-week road closure on Guisborough Road, the way things are looking possibly one or two days ahead of schedule!

Once we have completed this section we will then be moving onto York Road, at the Junction of Byland Road. 

Once again, we would like to thank you for your patience and support during these times and if you have any questions or feedback please use the contact us button at the top of the page.

I have shared some of the pictures taken from site below.

Thanks Sarah 

Update by Michelle Sell

Good afternoon please find the revised time table for the shuttle bus for Guisborough Road Nunthorpe and a plan which highlights the termination / stop areas to meet with Arriva buses.

If you require any additional information please do not hesitate to contact me through the portal or by telephone.

Kind Regards

Michelle Sell

 

Update by Michelle Sell

Good Evening All, Northumbria Water are providing a shuttle bus service during the scheduled, 6 week Guisborough Road closure. Readman Coaches will be operating Monday Sunday between the hours of 9am and 5pm in line with Arriva’s bus time table. Please see the map which provides the route of the shuttle bus. Arriva will be putting up time tables over the weekend to give you more accurate information and times.

Any questions please use the cntact us at the top of the page. 

Thanks 

Miichelle Sell (NWG PM)

Shuttle Bus Map

Update by Sarah Jayne Parvin

Good afternoon All, we were made aware the plans sent along with the letters, are very difficult to read due to the size they have been printed on, so I and Michelle Sell called round on Friday afternoon and hand delivered larger copies of these. We spoken to a number of residents, discussing the road closures and how MMB intend on carrying these out.

Traffic Management

Our intended road closures are scheduled below, one after another:

  1. Guisborough Road (Full Road Closure) - Mon 23/07/18 to Fri 31/08/18
  2. York Road (Single Lane Road Closure) - Mon 03/09/18 to Fri 02/11/18
  3. Beverley Road (Full road closure - Maintain access to local residents) - Mon 05/11/18 to Tue 18/12/18

Site compound and working area

If anyone requires any further information please respond below or get in touch using the Contact Us feature at the top of this page.

Thanks 

Sarah Vickers 

Update by Sarah Jayne Parvin

Good Morning Everyone,

My name is Sarahjayne Vickers and I am the Community Liaison Manager for Mott MacDonald Bentley, part of the dedicated team who will be working with Northumbrian Water during this essential remedial work at Guisborough Road.

My colleagues and I had the opportunity to meet some of you during our Customer Event on Wednesday 6th June at St Marys Hall, Nunthorpe. This was informative, to see the community on board and supportive of the project was amazing.

We were overwhelmed with how many people attended, approximately 50 of you came along to see us that afternoon! We even managed to catch a couple of dog walkers and let them know what was going on. I hope after the event you felt more informed and have a greater understanding about the project and why we are doing this work.

We would like to THANK YOU for your time, effort and support, we really appreciate it.

The work will commence Monday 16th July as planned and I know the first week will involve setting up the site compound, site preparation and investigation work ready to start the work 23rd July along with the 1st road closure on Guisborough road.

You will see me and our MMB guys led by Steve Dovaston (Site Manager) around for the next 20 weeks, if you have any questions you want answering please just ask. You can contact us either via the portal of use our email address MMBcustomerserviceteam@mottmac.com.

As the work progresses I will keep you informed as much as I can.

Thanks in advance

Sarahjayne Vickers

Update by Amanda Hunt

Hello everyone

As you may be aware, Northumbrian Water along with Mott MAcdonald Bentley (MMB) are planning work to improve the sewer network in your area.

Following Michelles earlier post I thought this was an opportunity to introduce myself as Amanda Hunt Northumbrian Water’s Customer Care Manager and part of the project team for the work we are planning. 

Once work gets underway MMB site team will keep you updated via this portal regarding the progress we make and I would like to take this opportunity to thank you in advance for your patience whilst we carry out these essential works, also be assured we will not need to isolate your water supply.  

If you have any queries or questions please feel free to contact us and we will all be happy to help. You can post here on our Community Portal with any questions you may have or tweet us @nwater_care or call. Whichever way is best, we’d really like to hear from you.

In the meantime enjoy the sunshine.

Amanda

 

Update by Michelle Sell

Afternoon everyone,

I would like to take this opportunity to introduce myself.  My name is Michelle Sell Northumbrian Water Project Manager and I am responsible for the repair works we are planning on Guisbrough Road.

On the back of the letter invition local residents to the Customer Event we held on 6 June 2018 to learn more about our proposals we will be writing to you this week to provide you with a further update and to share our plans for the work.

If you have any concerns surrounding the works hopefully we can put your mind at ease, so please do not hesitate to contact us via the contact us button above and either myself or a member of the project team will get back to you.

Many Thanks

Michelle

Work in your Community

Work in a business that supports your community

At Northumbrian Water, we work to make a difference in your community.

Have you considered a career that can help you do the same?

As well as the teams you see working in your streets, we have people doing a wide range of jobs that support that work to deliver the best possible water and sewerage services across the North East.

You can find out more about careers with Northumbrian Water and check out the latest vacancies by following the link below.

www.nwl.co.uk/careers