Hi everyone,
we have now completed the temporary access track and compound storage area into the field directly behind stephens road. This has been put in for when we start installing drainage up the estate roads. And we are continuing with building the three concrete chambers as i mentioned in my last update due to the work involved these take time to complete. The guys are currently installing more drainage on site at the moment but much smaller pipes now 450mm, to connect back into the existing system.
thanks
steve and the site team