GENERAL PROJECT

Murton Flooding

Together with our supply partner, ESH-MWH, we have undertaken a detailed study of the sewer network to establish the cause of flooding in the area. We want to keep you informed about our investigations and work we are considering in the Woods Terrace area.

Start Date

July, 2017

Estimated End Date

May, 2018

Contractor

NW, ESH

Update by Stephen Bennison

Hi everyone,

we have encountered some difficult ground conditions on site lately in the form of running sand (photos attached) so this slowed us down for a week while we de watered the area. This involved drilling to a depth of 5 metres and installing pipes so we could pump all the water out of the ground to enable us to install the drainage. we are currently working on the last of the three concrete chambers and hope to pour the concrete walls next week. I have attached a short video showing the directional drilling (auger bore) works which allows us to install pipework without actually digging.

steve and the site team.

Please Login in order to comment on this update.

View all updates
Rate us

Rate us

We would love to hear your feed back on our community portal.

There was an error saving your answers. Please try again.

Saving your answers.
Please wait.

Your answers have been saved. Thankyou for giving us your feedback.

1. Do you feel that our Community Portal has helped to keep you informed about our work?

2. How likely is it that you would recommend our Community Portal to a friend or colleague?

3. How likely is it that you would recommend Northumbrian Water to a friend or colleague?

4. Do you have any suggestions to improve our Community Portal? Optional