Update by Brian Hall
Hi everyone, again a busy week with lots going on at both sites
At Great Ayton:
Access has been improved into the humus tank and works ongoing reinforcing the base
Chemical storage bund wall construction is ongoing
At Stokesley:
Chemical dosing installation is ongoing
Electrical installation of the PST de-sludge pumps has commenced and are due to complete this week
Site wide ducting installation is now complete
All point of application kiosk bases have been constructed with kiosks landed in position
Sludge tank was emptied and cleaned allowing the new sludge mixing system to be installed this week