Update by Christine Taylor
Good morning,
Site have sent an update and some photos of their progress at Grassholme Reservoir.
- Carl Beck bed Area has been prepared for the supply and installation of impermeable membrane. Then the membrane will be fitted beneath realigned stream location in front of Legato Blocks. The stream is currently flowing through a temporary diversion pipe until works are further advance
- They have stripped the “Ancient Woodland” topsoil. The topsoil has been transported to agreed location on site for temporary storage. It will then be re-used after stabilisation of reservoir embankment works are completed.
- Legato Blocks placed in position to assist with long term stability of Reservoir Embankment.
Enjoy your week.