Update by Colin Butler
Good Afternoon Everyone
I just wanted to give a very brief update on our current position.
All tunnelling works are completed and we have temporarily reinstated the junction of Old Elvet and Territorial Lane. The crane is being removed from site as I type this and our men are on hand to then remove the temporary traffic signals for the Christmas period.
Thank you all so much for bearing with us through what has been an incredibly challenging few weeks. Your patience and adherence to safe traffic zones has been extremely important to us as we strive to contine our Zero harm and CARE approach to these works.
Have a wonderful Christmas and New Year with your loved ones and be sure to overindulge on all that is good and fun, I know I will
Colin