Update by Bethany Oakley
Good afternoon all,
I hope you’re well.
Before we leave for the Christmas Break, I wanted to share a final update on the Great Broughton Sewage Treatment works. The Team have been continuing with their progress and this is an excellent end to the year.
- Rising main pump plinth 2 reinforcement installed and concrete has been poured.
- Rising main 2 Stainless Steel suction pipework installed
- Rising main 1 Stainless Steel inlet pipework installed
- Storm tank footpath and aco drainage constructed.
- Inlet channel cored through to confirm reinforcement depth, good news no change to our current design required.
- Prepped road and chambers ready for final road pour this week.
In the event that you require some assistance in our absence during the Christmas Break, please contact 0345 7171100
We wish you a Merry Christmas and a Happy and Healthy 2025.
Take care,
Bethany
Please Login in order to comment on this update.