The construction phase of this project is now complete.

There may still be updates, so the project will remain here. We are still monitoring the project and will reply to any comments. So if you have any questions please feel free to comment or contact us here.

GENERAL PROJECT

Lockwood Beck Reservoir Safety

Together with our supply partners Interserve we plan to carry out essential ground works maintenance, investigation and improvements to Lockwood Beck reservoir, starting on site on the 24th August and lasting for around 16 weeks. For the safety of all visitors, site users and those working on the project, the decision has been made to close the site for the duration of the work. I would like to thank adjacent residents and visitors for their patience while we undertake this essential work.

Project updates

Update by Shafqat Akbar

Hello everyone. I want to give you all a quick update on the restart of the construction works at Lockwood Beck. We are looking to restart in early May 2021.

I will update NWL Community Portal with a confirmed start date when this is agreed.

We inspected the grounds earlier. The ground conditions are not suitable for works to start.

We have some footpath  and ground works to complete.

Please Login in order to comment on this update.

Update by Shafqat Akbar

The works at Lockwood Beck are progressing well but the weather will prevent us from finishing all of the works.

The installation of the tensar reinforcement on the embankment is almost complete.

The recent wet weather is has waterlogged the ground. We are not able to complete the construction on the top of the embankment in this site visit. We will agree a date for the return visit with Northumbrian Water. 

The works at the bottom of the embankment will continue as these will not be affected by the waterlogged ground.

We have started installing the temporary works adjacent to the redundant Northumbrian Water buildings.

 

 

 

Please Login in order to comment on this update.

Update by Shafqat Akbar

In today's update, I want to talk about the works our site teams are doing.

We have set up the project compound. We have established pedestrian routes to separate pedestrians from traffic. There are hand sanitising stations set up to help with managing the covid risk. We have limited numbers of people that can be in one cabin at any time.

Following the recent rainfall, the leve of water in the reservoir is high. This photograph shows the large amount of water that flows into the spillway.

The earthworks operations are progressing well. This photograph shows the start of the strengthening works at the top of the reservoir dam.

A lot of work is progressing at the bottom of the dam. The recent wet weather has waterlogged the ground. 

 

Please Login in order to comment on this update.

Update by Shafqat Akbar

Hello. We have established the site compound at the Lockwood Beck reservoir project. We are making good progress on site.

We have completed all the works on the spillway.

We can now let the reservoir water level rise to its normal level as all works on the spillway are complete.

The site team has been planning and agreeing the detail of the works on the embankment. We will be starting these works shortly.

 

Please Login in order to comment on this update.

Update by Shafqat Akbar

Hello everyone. First of all a quick update on the good work the site team has completed in the previous two weeks. We have made good headway on a lot of the preliminary works. We have started operations around the spillway and cope. We have agreed access routes to the works areas with the Northumbrian Water and the local authorities. We have set up control measures that will ensure site compliance with the government Covid-19 guidance. 

Please Login in order to comment on this update.

Update by Shafqat Akbar

Works have started on site and good progress has been made.

Northumbrian Water lowered the reservoir water level. This allowed Interserve to start works on the spillway.

Works to the spillway wier are progressing very well

We are not able to drive heavy plant and machinery over this access bridge. We have agreed with the local authority to access the site from the Whitby Road.

 

Please Login in order to comment on this update.

Update by Shafqat Akbar

We have set up our compound and we are ready to carry out the improvement works.

Please Login in order to comment on this update.

Update by Shafqat Akbar

Hello. Just to let everyone know that Interserve are ready to start works on site. We have set up our site offices. 

Please Login in order to comment on this update.

Work in your Community

Work in a business that supports your community

At Northumbrian Water, we work to make a difference in your community.

Have you considered a career that can help you do the same?

As well as the teams you see working in your streets, we have people doing a wide range of jobs that support that work to deliver the best possible water and sewerage services across the North East.

You can find out more about careers with Northumbrian Water and check out the latest vacancies by following the link below.

www.nwl.co.uk/careers