Update by Rachel Rutter
Good Afternoon All,
Hope you've had a lovely weekend.
Our site team carried out the following work last week;
following the excavation we have installed a concrete layer to the base followed by installation of reinforcing steel for the structure.
This week the site team will be installing the steel reinforcement alongside side shuttering works. New ducting and chambers for carrying electric cables will be installed.
If you have any queries at all regarding our work in your area, please do not hesitate to contact us.
Thank you
Rachel