The construction phase of this project is now complete.

There may still be updates, so the project will remain here. We are still monitoring the project and will reply to any comments. So if you have any questions please feel free to comment or contact us here.

GENERAL PROJECT

Lamesley Rising Main Replacement

To replace a failing pumping main from Lamesley Sewage Pumping Station to Birtley Sewage Treatment Works.

FAQs

What will the working hours be?

The typical working hours are likely to be Monday to Friday, between 8.00am and 6.00pm. 

Will my drainage or water supply be affected?

We have no plans to disrupt your drainage or water supply while we work on this project. In the unlikely event that the team accidently disrupts the drains or water supply, our  response team will be notified immediately, and emergency repairs quickly undertaken. 

Will the work cause disruption?

With construction work it is inevitable that there will be some disruption in the immediate vicinity of the work. There will also be an increase in traffic in the area, mainly with vehicles transporting materials to and from the working area/site compound.

Will I be able to access my drive or directly park outside my property?

We do not envisage restricting access to properties, but parking may need to be restricted where we are laying the pipe in the highway.

How will residents be kept updated?

For information and advice please contact us on 0345 717 1100 or log onto www.nwl.co.uk to chat online or arrange for a call back from our project team to discuss any queries.  
We will keep your community portal updated with key information about our progress. For notifications about project news, traffic information and progress updates please sign up to the community portal here. 

Any customers that will be directly affected by our work will be notified in advance of the work starting by our site team.

Will the site be dangerous?

The site will be operated by our experienced contractor working to tight health and safety standards. Working areas will be securely fenced off from public access at all times. 

We do ask that everyone respects the site fencing, signing, guarding and instructions of our team when required for your own safety. 

What will it look like when the works are complete?

The replacement pumped sewer will be buried underground, but there’ll be several chambers along the length of the pipe.  Reinstatement of the working areas will be undertaken to ensure that they are returned to at least the pre-construction condition.

Will there be dust, vibration and noise?

The construction work will involve the use of machinery, cutting equipment, digging up ground and working with granular materials which will result in some dust, vibration and noise. The site team will do everything they can to minimise any inconvenience caused by this and will make sure that the work is carried out safely.

Will the roads be kept clean during the works?

The work will involve excavation and transporting of subsoils and other excavated materials to storage or for disposal which may cause dirt on the roads. 

The site team will employ a road cleaning specialist with mechanical road sweepers which will be used as necessary to maintain the roads affected. 

What happens on bin collection days if the bin wagon can not get to my property?

We work closely with the local council on many matters including bin collections. Please put your bin in the normal place and we will make sure that it is moved to a place where it will be emptied. In the unlikely event that a bin collection is abandoned, we will let you know and arrange a revisit.

Work in your Community

Work in a business that supports your community

At Northumbrian Water, we work to make a difference in your community.

Have you considered a career that can help you do the same?

As well as the teams you see working in your streets, we have people doing a wide range of jobs that support that work to deliver the best possible water and sewerage services across the North East.

You can find out more about careers with Northumbrian Water and check out the latest vacancies by following the link below.

www.nwl.co.uk/careers