GENERAL PROJECT
CURRENT WEATHER
9°C

Rosehill Road, Willington Quay

Northumbrian Water is looking to improve the resilience and enhance the performance of the sewer network in the Willington catchment. We are proposing the construction of a new sewer overflow at the rear of Marina View, this work will be undertaken within the fenced off compound with site access taken from Rosehill Road. We will also be increasing the size of short sections of the existing sewer within Rosehill Road.

FAQs

What will the working hours be?

Typical working hours would be Monday to Friday, between 8.00am and 6.00pm. If required, work may also be carried out between 8.00am and 1.00pm on a Saturday. We will notify you when weekend working may be required.

Will my water supply be affected?

We have no plans to disrupt your water supply while we work on this project. In the unlikely event that the team accidently disrupts the water supply, our clean water response team will be notified immediately and emergency repairs quickly undertaken.

Will the work cause disruption?

With large construction work it is inevitable that there will be some disruption in the immediate vicinity of the work. There will also be an increase in heavy traffic in the area, with vehicles transporting materials to and from the working sites and site compounds.

Will access to my property be maintained?

When construction works are necessary on the main access roads every effort will be made to undertake these works within a lane closure with associated traffic management. Any junctions will be crossed by closing one half at a time thereby ensuring that access is maintained throughout. Footpaths will remain open and pedestrian access around the works will be maintained at all times.

How will residents be kept updated?

For information and advice please contact us on 0345 717 1100 or log onto www.nwl.co.uk to chat online or arrange for a call back from our project team to discuss any queries. 
We will keep your community portal updated with key information about our progress. For notifications about project news, traffic information and progress updates please sign up to the community portal here.

Any residents that will be directly affected by our work will be notified in advance of the work starting by our site team. 

Will the site be dangerous?

The site will be operated by our framework partner Esh-Stantec an experienced contractor working to tight health and safety standards. Working areas will be securely fenced off from public access at all times.

We do ask that everyone respects the site fencing, signing, guarding and instructions of our team when required for your own safety.

Will there be dust, vibration and noise?

The construction work will involve the use of large machinery, road cutting equipment, digging up ground, pouring concrete and working with granular materials which will result in some dust, vibration and noise. The site team will do everything they can to minimise any inconvenience caused by this and will make sure that the work is carried out safely.

Will the roads be kept clean during the works?

The work will involve digging up and transporting large volumes soil and other excavated materials to storage or for disposal which may cause dirt on the roads.

The site team will employ a road cleaning specialist with mechanical road sweepers which will be used daily to maintain the roads affected.

What happens on bin collection days if the bin wagon cannot get to my property?

We work closely with the local council on many matters including bin collections. Please put your bin in the normal place and we will make sure that it is moved to a place where it will be emptied. In the unlikely event that a bin collection is abandoned, we will let you know and arrange a revisit.

Will I be able to access my drive or directly park outside my property?

For this project, it is unlikely that driveways will be blocked however if it is necessary to work adjacent to driveways we will contact you in advance where this is the case. Footpaths will remain open at all times.

We recognise that it is a condition of some insurance policies that cars are parked off road during different periods of the day. It is our experience that insurance companies understand that during work of this type, this is not always possible. We always suggest that you contact your individual insurance company if you have any concerns with regard to insurance matters.
Please let us know if you, or any family, friends or neighbours will require additional assistance for access or anything else while this work is completed by calling 0345 717 1100.

Work in your Community

Work in a business that supports your community

At Northumbrian Water, we work to make a difference in your community.

Have you considered a career that can help you do the same?

As well as the teams you see working in your streets, we have people doing a wide range of jobs that support that work to deliver the best possible water and sewerage services across the North East.

You can find out more about careers with Northumbrian Water and check out the latest vacancies by following the link below.

www.nwl.co.uk/careers